Cabinet approves development of 6/4 lane Elevated Corridor along Varuna River Bank & its Ramps/Loops in Uttar Pradesh on Hybrid Annuity Model at total Capital Cost of Rs.10,998.32 Crore

PIB ·

Why in news

The Cabinet Committee on Economic Affairs (CCEA) has approved the development of a 43.218 km Link/Connector Corridor along the River Varuna in Varanasi, Uttar Pradesh, to decongest the city.

Exam relevance

GS3, GS1 · Economy, Governance, Geography · Prelims · Mains

Key facts

  1. The project is a 43.218 km Link/Connector Corridor connecting NH-31 and the Varanasi Ring Road along the River Varuna.
  2. It aims for decongestion of Varanasi city in Uttar Pradesh.
  3. The corridor is a 6/4-lane predominantly elevated structure, including main carriageway, flyovers, loops, ramps, and service roads.
  4. It will be implemented by the National Highways Authority of India (NHAI).
  5. The project will be executed under the Hybrid Annuity Model (HAM).
  6. The total capital cost is Rs.10,998.32 crore, comprising a civil construction cost of Rs.4,565.33 crore and land acquisition cost of Rs.934.91 crore.
  7. It is a major component of the Varanasi Decongestion Plan.
  8. The corridor will provide seamless connectivity between NH-31 and Kashi Railway Station.
  9. It will substantially improve access to Varanasi Ring Road, Varanasi Airport, Kashi Railway Station, Varanasi City Railway Station, Varanasi Junction, Deen Dayal Upadhyaya Junction, Ramnagar Port, Sampurnanand Sanskrit University, the ghats of Varanasi, and the adjoining Chandauli region.
  10. The project is designed for an operating speed of 80–100 km/h.
  11. It is expected to reduce travel time between NH-31 and Kashi Railway Station from approximately 40 minutes to 20 minutes, a reduction of nearly 50 per cent.

Prelims pointers

  • The project is located in Varanasi, Uttar Pradesh.
  • It is along the Varuna River.
  • The implementing agency is the National Highways Authority of India (NHAI).
  • The project is being implemented under the Hybrid Annuity Model (HAM).
  • It connects NH-31 and the Varanasi Ring Road.
  • The approval was granted by the Cabinet Committee on Economic Affairs (CCEA).

Mains practice question

Discuss the significance of infrastructure projects like the Varuna River Elevated Corridor in promoting urban decongestion and regional economic development. Evaluate the role of models like the Hybrid Annuity Model (HAM) in accelerating such projects.

Static linkage

This project links to broader themes of urban infrastructure development, national highway network expansion, and the adoption of Public-Private Partnership (PPP) models like the Hybrid Annuity Model (HAM) in India's infrastructure sector.

Significance

The Varuna River Elevated Corridor holds significant importance for urban development and regional connectivity. It will substantially alleviate traffic congestion in Varanasi, a major pilgrimage and tourist destination, thereby improving the quality of life for residents and enhancing the visitor experience. By providing seamless connectivity to key transport hubs and important sites, it will boost economic activities, including tourism and trade, and facilitate smoother logistics. The implementation through the Hybrid Annuity Model (HAM) reflects a modern approach to infrastructure financing and execution, balancing risk between public and private entities and potentially ensuring timely completion and quality.

Original source

Infrastructure · Urban Development · Varanasi · NHAI · HAM · Connectivity · Uttar Pradesh · Economic Affairs

Cabinet approves development of 6/4 lane Elevated Corridor along Varuna River Bank & its Ramps/Loops in Uttar Pradesh on Hybrid Annuity Model at total Capital Cost of Rs.10,998.32 Crore on project[UPSC]